Gemba Data Collection: Checklist for Mapping the Current State

Intermediate 8 min read · Updated 2026-10-31

The quality of a value stream map is decided on the shop floor. Numbers from the ERP system describe the plan, not reality. This checklist shows what to collect at each process, how to measure, and how the data gets into the map.

Preparation

What to record at each process

Walk the flow backward from shipping. At each process, fill in the data box:

Inventory and information flow

Count inventory on the day you walk the floor: before the process, after the process, in buffer storage and in transit. Count pieces, or containers × quantity per container, not the stock level in the system.

For the information flow, ask at each process: how do you know what to make next? The answers (weekly schedule, verbal instruction, kanban, "go see") are the arrows at the top of the map.

Measuring with your phone

With the mobile data capture in the app you time cycle times right at the line: start, tap "Part done" for each finished part, stop. The mean or median goes into the data box as cycle time. Changeover time, uptime, scrap rate and operators go into large input fields. Without a connection, the values are buffered and sent later. The link is available in every live session, also as a QR code.

Common mistakes

Practice in the editor

Start with the blank current state template and enter the processes of your line with measured cycle times.

Open the template in the editor Start blank

Free, no sign-up, in your browser. Metrics, timeline and checks are calculated automatically.

Frequently asked questions

How many cycle time readings do I need?

At least five, and ten for processes with a lot of variation. The median is more robust against outliers than the mean; you can choose either in the mobile data capture.

Cycle time or work content?

Cycle time measures the interval between two finished parts at the process exit. Work content is the pure working time on the part; with several operators it is longer than the cycle time.

Self-test

1. Where should the cycle times on the current state map come from?
The current state map shows reality; standard times hide losses.
2. How is inventory determined for the map?
You count what is actually there on the day you map.

Keep learning