Value Stream Mapping Exercise with Solution: Pump Assembly

Intermediate 25 min read · Updated 2026-10-31

This exercise takes you from the current state of a pump assembly line to the future state. The tasks are attached as comments directly to the elements of the map; the model solution is a second template that you can compare using the current/future comparison.

Starting point

Centrifugal pump P20, 300 pieces per day, one shift with 450 minutes of working time. Five processes: machining (75 s, changeover 40 min, batch size 150), subassembly (60 s), final assembly (110 s, 90% uptime, 2% scrap rate), testing (50 s), shipping. Inventory of 150 to 1,500 pieces between them, and a weekly schedule sent to every process.

The six tasks

How to proceed

Open the template "Exercise: current state pump assembly". Click an element to read its task in the comments panel on the right. The metrics bar at the bottom and the checks panel help you verify your work. You can record your answers as comments on the element.

Then load the template "Exercise: solution (future state)" and compare both with the current/future comparison. The solution explains each change in a comment: flow cell, supermarkets, changeover cut to a quarter, FIFO to testing, daily schedule at the pacemaker.

Practice in the editor

Open the template "Exercise: current state pump assembly", read the tasks on the elements, then load "Exercise: solution" and compare.

Open the template in the editor Start blank

Free, no sign-up, in your browser. Metrics, timeline and checks are calculated automatically.

Frequently asked questions

Do I need an account for the exercise?

No. The templates load without signing in, and your work stays local in the browser. With a free account you can save the current state and the solution in the cloud and compare them.

Is the exercise suitable for teaching and training?

Yes. Instructors and trainers can share the template with a share link or edit it together in a live session; participants do not need an account.

Self-test

1. Takt time at 450 min and 300 pieces per day?
450 × 60 ÷ 300 = 90 seconds.
2. Effective cycle time of final assembly at 110 s, 90% uptime, 2% scrap?
110 ÷ 0.9 ÷ 0.98 = 124.7 s.

Keep learning